TL;DR

A new hire equipment questionnaire is nine questions sent at offer acceptance, and it prevents most of what goes wrong in somebody’s first week. Address, access, power, connectivity and accessibility. It costs two minutes of their time and removes the guessing that otherwise produces a second shipment.

  • Send it at offer acceptance, not at contract signature. The address is the long pole.
  • Ask about building access, not just the address. Condo desks refuse couriers.
  • Ask about connectivity before designing a video heavy role around it.
  • Ask about accessibility needs separately, and route them separately.
  • Do not ask people to choose a specification from a list they cannot judge.
  • Record the answers against the serial number, not in an email thread.

When to send it

Send the new hire equipment questionnaire at offer acceptance. Not at contract signature, and definitely not in the onboarding week.

The reason is the critical path. Procurement does not need an address, so the build can be decided and the order placed immediately. Delivery does need one, and the address is usually the last thing you get because it waits on paperwork.

Sending the questionnaire at acceptance decouples those two. You order against the plan, you deliver against the answers, and the only thing still sequential is the courier.

There is a softer reason too. A short, well written questionnaire in the first week after somebody accepts is an early signal that the company is organised. It is one of the cheapest impressions you will ever make.

The nine questions

Delivery

  1. What is the full delivery address, including any unit or building detail? Partial addresses are the most common cause of a failed first delivery.
  2. Is it a house, an apartment building or a complex with a security desk? Many buildings will not accept a parcel on a resident’s behalf.
  3. What mobile number should the courier use?
  4. Are there days or times when delivery will not work?

Setup

  1. What is your internet connection, roughly, and do outages happen often?
  2. What plug type do your sockets use? Cheaper to ask than to guess, and the answer decides whether you source the cable locally.

Needs

  1. Do you have any accessibility requirements we should know about for your equipment?
  2. Will you need a monitor, keyboard or headset, or do you have your own you would rather use?
  3. Is there anything about your setup we have not asked about?

Nine questions, two minutes. The last one catches more than the other eight combined, because people know things about their situation that no form anticipates.

One thing deliberately not on the list is anything about what happens to the machine at the end. That belongs in the induction conversation rather than a form, though it is worth knowing the standards before you describe them: NIST Special Publication 800-88 sets out the recognised approaches to media sanitization, and the EPA lists certified electronics recyclers for hardware that eventually reaches end of life.

Three questions not to ask

Some well meant questions create more problems than they solve.

Do not ask them to choose a specification from a list. Most people cannot judge whether they need more memory, and the ones who can will ask anyway. You end up with either a defensive over specification or somebody quietly under equipped because they did not want to seem demanding. Decide the build by role and offer a documented exception route.

Do not ask what they used at their last job. It invites a comparison you may not meet and tells you about somebody else’s procurement policy rather than about this role.

Do not ask for personal information you do not need. A questionnaire about equipment that strays into household details is uncomfortable and unnecessary. Ask what affects the delivery and the setup, and nothing beyond it.

Why accessibility gets its own question and its own route

Question seven is deliberately separate, and so is what happens to the answer.

Accessibility requirements, genuine role requirements and preferences are three different things, and the most common design error is routing all three through one approval queue. Somebody who needs specific equipment to work comfortably should not be waiting behind somebody who would like a larger monitor.

Two practical points. Ask the question in a way that does not require disclosure of anything medical, because you need to know what equipment helps rather than why. And give it a named route with a short turnaround, so the person is not negotiating in their first week.

What this costs is a sentence on a form and a decision about who handles the replies. What it prevents is somebody starting a job already uncomfortable and already feeling like an exception.

What to do with the answers

Disclosure: RemoAsset, named below, is owned by the same people who publish this site. It is described with its limitations stated, on the same terms as every other supplier. PeopleOpsHQ takes no vendor money and sells no placements.

The questionnaire is only useful if the answers reach the people acting on them, which is where most of this breaks.

Record them against the device, not in an email. The address, the building type and the phone number belong next to the serial number in your asset record, because that is what you will need again at exit.

Source power cables locally. Shipping an adapter from your home market is slower and worse than buying the right cable where the person is.

Act on connectivity before the role starts. If the answer suggests a weak connection and the role is video heavy, decide now whether that is an allowance, a mobile fallback or a role design question.

For teams shipping across borders, suppliers including Workwize, Firstbase, Fleet, Allwhere, GroWrk and Esevel handle the delivery leg. RemoAsset publishes a subscription from 1,499 dollars a year, states coverage of 80 or more countries, and handles sourcing and delivery to the person’s address.

Where it struggles. It does not send your questionnaire or hold your HR data, so the asking stays yours. It publishes no per device rate, so small teams cannot model it from the published subscription pricing without asking.

The decision table

Situation Scale Setup Primary pain Recommended starting point
First remote hires 1 to 5 Nothing asked Guessing, then a second shipment Send the nine questions at offer acceptance
Hiring across borders Any Shipping from a hub Plugs, addresses, customs Add plug type and buy cables locally
Video heavy roles Any Connectivity assumed Calls unusable Ask about the connection before the role is designed
Accessibility requests arriving late Any One approval queue Queued behind preferences Separate question, separate route, short turnaround
Answers lost in email Any Form replies in an inbox Needed again at exit Record against the serial number in the asset record

What not asking costs

The visible cost is a second shipment. A monitor nobody mentioned, a cable with the wrong plug, a headset the role turned out to need. Each one is a courier charge and a week.

The second is the failed first delivery, which is more expensive than it looks. A parcel refused by a building, returned to a depot and redelivered costs days at exactly the moment somebody is trying to start.

The third is the accessibility request that surfaces in week three because nobody asked in week zero. By then the person has spent a fortnight working in a setup that does not suit them and has had to raise it themselves.

And the fourth is the signal. An organised first week says something true about the company. A chaotic one says something true as well.

How many of your last ten hires needed a second shipment in their first month?

Making it automatic

The questionnaire should not depend on somebody remembering to send it.

Trigger it when an offer is marked accepted. Route the replies into the asset record rather than an inbox. Give accessibility answers their own route with a named owner. And review the questions once a year against what actually went wrong, because the ninth question will keep telling you what to add.

Where people are spread across countries you do not operate in, the answers then need somebody who can act on them locally. A provider handling sourcing and delivery across markets closes that gap.

Our guides to IT onboarding and device provisioning cover what happens after the answers arrive.

Frequently asked questions

When should we send a new hire equipment questionnaire?

At offer acceptance, which is usually several weeks before anybody thinks to send it. Procurement does not need an address, so the build can be decided and ordered straight away, but delivery does, and the address normally waits on contract paperwork. Sending at acceptance decouples the two so the only remaining sequential step is the courier, which is the one you least control.

What should we ask about the delivery address?

The full address including unit or building detail, whether it is a house, an apartment building or a complex with a security desk, a mobile number the courier can use, and any days or times that will not work. The building type question is the one people skip and it matters, because many buildings will not accept a parcel on a resident’s behalf and the delivery fails silently.

Should we let new hires choose their own laptop specification?

Generally no, because most people cannot judge whether they need more memory and the ones who can will tell you anyway. Asking produces either defensive over specification or somebody quietly under equipped because they did not want to seem demanding. Decide the build by role, publish it, and offer a documented exception route for genuine requirements.

How should we ask about accessibility needs?

As its own question, phrased around what equipment would help rather than why, so nobody has to disclose anything medical to get a working setup. Route the answers separately with a named owner and a short turnaround, because the common design error is putting accessibility requirements in the same approval queue as somebody who would like a bigger monitor.

Why ask about plug type and connectivity?

Because both are cheaper to ask than to guess and both cause real first week problems. Plug standards vary by country and sometimes by building age, and the answer decides whether you ship a cable or buy one locally, which is almost always the better option. Connectivity matters because a video heavy role designed around an assumption nobody checked is a problem you create yourself.

What do we do with the answers?

Record them against the serial number in your asset record rather than leaving them in an email thread, because the address and building details are exactly what you will need again at exit and that is usually a year or more later. Act on the connectivity and accessibility answers before the start date rather than filing them, since the whole point was to change what happens next.

Is nine questions too many?

Two minutes of somebody’s time, sent once, against the cost of a failed delivery or a second shipment. In practice people appreciate being asked, because it signals that the company has thought about their first day. If you want it shorter, the four delivery questions do most of the work, but the final open question catches more than the others combined and is worth keeping.